Water Supply Connection Regulations
Disconnection of Water Connections
| Water connections can be disconnected temporarily for a minimum period
of three months and a maximum period of 12 months as per the request
of the consumers in the prescribed application form to the Assistant
Executive Engineer along with the remittance of application fee,
disconnection fee and all dues.
Water connections are liable to be disconnected for the following reasons:
Reconnection
|
| Inside | Ownership | Meter | Water Tariff | Fee | Sewer Connection | Payment |